MU120131A/32A PON Quick Start Guide
29
4.6. Testing Load
(Objective)
To perform network load testing to evaluate the PON system performance
(Procedure)
Vary the ONU1 Tx rate.
(Results, Goal)
Generate network load and measure BER
Increasing load of OLT-side Tx Frames
Select Unit3 Port1.
Stop Transmit.
Select the stream and press
“Edit...” to edit the stream.
Select
“Random” at “Inter Frame Gap:” and set 1% at “Unit” of “Min:” and 10% at