5
Lifting
&
Installation
It is recommended that this machine is lifted by the use of a crane or hoisting mechanism as it is
very heavy.
Fig 2. Lifting drawing.
Lifting
&
Installation
Please refer to figure 3 when installing this machine. As this lathe is for the most part pre-assembled
at the factory, there is not a great deal of assembly for the end user. Line up the four bolt holes with
the stand and carefully place the lathe on the stand.
Fig 3. Installation drawing.
After installation, be sure to clean the antiseptic coat (used to preserve and protect during shipping)
off the guide carriage, tail stock, change gear and pulley with a clean cloth and non-corrosive
cleaner.
Summary of Contents for BL330E
Page 1: ......
Page 10: ...10 ...
Page 14: ...14 Parts Diagram Headstock ...
Page 16: ...16 Parts Diagram Trestle ...
Page 18: ...18 Parts Diagram Bed ...
Page 20: ...20 Parts Diagram Apron ...
Page 22: ...22 Parts Diagram Tailstock ...