
QUEENSLAND URBAN UTILITIES
QUU CONTRACT NO: C1112-022
LUGGAGE POINT STP/LUGGAGE POINT
OPERATION & MAINTENANCE MANUAL
Chp4Maintenance.doc
DRAFT: A 23-Jul-13
Page 29 of 36
Refer to figure 4-19. Position the support bushing (2) on the machine shaft (7).
Figure 4-19. Positioning the Support Bushing
Luggage Point STP ST18 Pre Treatment (Aqua-Screen (Andritz) Operation and Maintenance Manual) General
Q-Pulse Id: TMS579
Active: 13/12/2013
Page 72 of 316