![Andover Controls InfiLink 200 Installation Manual Download Page 10](http://html1.mh-extra.com/html/andover-controls/infilink-200/infilink-200_installation-manual_2942452010.webp)
6
InfiLink 200 Installation Guide
Inspecting the Ground
You can check your ground as follows:
1. Check your ground by first inspecting the building power
distribution panel for earth ground termination. If the ground
termination is any of the following, it is not adequate and must be
corrected:
• Does not exist.
• Is connected to a corroded or galvanized pipe.
• Is connected using a small gauge wire (smaller than 14 AWG).
2. Be sure your InfiLink 200 is connected to the ground with a copper
conductor that terminates at the distribution panel.
Environmental Requirements
The InfiLink 200 operates in rooms with temperatures ranging from 32
to 120
°
F and with humidity up to 85%, non-condensing.
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com