As soon as the exhaust gas temperature has dropped 10°C under the saved temperature, several entries
must be made (see "Printing").
As soon as the O
2
has reached >= 20.5 %, two print-outs are made: 1 for the installation engineer, 1 for
the inspector (see "Printing").
The print-out also includes the following lines:
Last inspection
Thermostat
BUWAL measurement
xx.xx.xx
xxx°C
No. x
Once the printing procedure has been completed, the second BUWAL measurement begins with the
display below.
Put system into
operation
and
confirm
flames formed
<< Bip – Bip – Bip – Bip >>
Confirm with
The temperature of the thermostat is no longer requested.
The second BUWAL measurement follows the same pattern as the first measurement.
Once the two print-outs (one for the installation engineer and one for the inspector) are finished, you are
asked if there will be a third measurement sequence:
Carry out third
measurement
sequence?
M: Yes
E: No
Start third measurement with
.
With
the first commissioning display appears
(see "Commissioning").
Page 31