5
INSTALLATION - WIRING
1.
Shut off the circuit breaker for the well system. Loosen
the silver screw on top of the control and remove cover
to expose the control wires.
Electrocution hazard.
For your
safety, the information in this manual
must be followed to minimize the risk of electric shock,
property damage or personal injury. Properly ground
to conform with all governing codes and ordinances.
2.
The 12 gauge wire leads are pre-stripped and ready
to accept standard wire nuts. Each wire is color
coded to correspond with the diagram below. Use
water tight conduit, connections, and wire nuts for an
outside application.
3.
Wiring is similar to a traditional mechanical pressure
switch. Two leads are connected to line supply, while
the other supply the pump motor or starter. Wire the
control to the line supply and pump motor or pump
starter as required by the manufacturer's instructions.
It is recommended that service switch be installed in
addition to the circuit breaker. The disconnect for the
controller must break all incoming power lines. This
should interrupt line voltage and be installed near the
Well-X1
®
and labeled appropriately.
4.
After completing the wiring, reattach top cover and
tighten screw. Ensure no loose wires protrude from
the control.
LINE
LINE
MOT
OR
MOT
OR
BLACK
WHITE/STRIPE
BLUE
WHITE
SCREW