government. This equipment needs to be separately earthed. It is suggested that
the ear-thing wire be as short as possible and it is prohibited to earth it together
with other equipments.
b. While overhauling, please shut down the power supply first, and the
temperature of the radiator is very high, so don’t touch it to avoid burn.
c. After the spark alarm, you should shut down the general power supply of
the procedure and then put out the fire.
d. The spark test or repairing work that needs climbing should be carried out
by more than two people.
2. Installing
2.1 Install requirements
The detailed requirements of installing are as follows:
a. Enough length of straight duct must be reserved within the installed route. In
the ordinary course of events, if the length of the straight duct is over 4.5m, it can be
installed according to figure 9. The metal detector and diverter must be installed to
the straight duct (refer to figure 9a).
b. The control box of AMP-2000V5 diverter should also be installed to the
straight duct together with metal detector and diverter for it contains spark detectors.
But for the limitation of the straight duct’s distance, if the straight duct was just about
3m, the control box could be installed to the other side of the bent duct of the cotton
intake (figure 9.b).
Figure 9.a