66
System Integration
Rev 5 – MAY 2019
OMMGGP00185
Electro Pneumatic Converter Installation
The 8064C electro pneumatic converter must not be installed in a position
subject to vibration.
Temperature Sensor Installation
Position as close as possible to the point of control.
Ensure positioned at least 6 pipe diameters in length from any junction.
Ensure the end 40 mm of probe is a close as possible to the centre of the
flow path.
Do not run cables in very hot areas which can cause cable failure and
inaccurate measurement.
Avoid installation in areas of high vibration.
Avoid installation into potential air pockets.
Position in an accessible location for future maintenance access.
Use heat transfer compound in thermal well.
Controller Installation
The installation will be affected by the choice of controller components. Refer
to manual OMM807100043 (PID Controller) or 46307L004 (Pneumatic
Indicator Controller) for specific installation details.
Summary of Contents for 02GGH
Page 2: ......
Page 8: ...8 Introduction Rev 5 MAY 2019 OMMGGP00185...
Page 14: ...14 System Overview Rev 5 MAY 2019 OMMGGP00185...
Page 23: ...23 Pneumatic Actuator 82046L OMMGGP00185 Rev 5 MAY 2019 Fig 5 Mode 32...
Page 24: ...24 Pneumatic Actuator 82046L Rev 5 MAY 2019 OMMGGP00185 Fig 6 Mode 23...
Page 25: ...25 Pneumatic Actuator 82046L OMMGGP00185 Rev 5 MAY 2019 Fig 7 Mode 12...
Page 26: ...26 Pneumatic Actuator 82046L Rev 5 MAY 2019 OMMGGP00185 Fig 8 Mode 21...
Page 27: ...27 Pneumatic Actuator 82046L OMMGGP00185 Rev 5 MAY 2019 Fig 9 Mode 13...
Page 28: ...28 Pneumatic Actuator 82046L Rev 5 MAY 2019 OMMGGP00185 Fig 10 Mode 31...
Page 41: ...41 Pneumatic Actuator 82046L OMMGGP00185 Rev 5 MAY 2019 Fig 22 Piston Orientation...
Page 58: ...58 PID Controller 8071D Rev 5 MAY 2019 OMMGGP00185...
Page 60: ...60 Pneumatic Indicator Controller SG80 Rev 5 MAY 2019 OMMGGP00185...
Page 79: ...79 Technical Data OMMGGP00185 Rev 5 MAY 2019 13 1 5 Valve Dimensions Fig 43 Valve Dimensions...