10
H. Connecting the cables
1
.
Connect the cables follow step
a
to
f.
(See Fig. 17).
Fig.17
a.
Cable pass through
the carriage
b.
Push the carriages higher than
chain pulley, cable pass
through the top end of the
carriages and pass through
the hole of the bottom steel
plate of the carriages
c.
Pass through the
cable from the small
pulley
d.
Cable pass through
the small pulley in
another column
e.
Pull out the cable from
bottom to top and hang
the cable on big pulley
f.
The fitting of cable pass
through the hole of the
bottom steel plate of
the carriages and screw
the nuts.
Summary of Contents for BP-10
Page 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Page 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Page 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Page 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Page 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Page 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...