3
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Hammer
Level Bar
English Spanner (12")
Ratchet Spanner With Socket (28
#
)
Wrench set
Carpenter’s Chalk
Screw Sets
Tape Measure (7.5m)
Pliers
Socket Head Wrench (6
#
)
Lock Wrench
(10
#
, 13
#
, 14
#
, 15
#
, 17
#
, 19
#
, 24
#
, 27
#
)
Fig. 3
Summary of Contents for BP-10
Page 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Page 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Page 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Page 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Page 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Page 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...