5
III. STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of baseplate
(See Fig. 6).
C.
Check the parts before assembly
1
.
Packaged lift and hydraulic power unit
(See Fig. 7)
2. Move the lift aside with a fork lift or hoist, and open the outer packing carefully, take
off the parts from upper and inside the column, take out the parts box
,
check the
parts according to the shipment parts list
(See Fig. 8).
Shipment Parts list
Protect Cover
Parts Box
Chalk a line
Fig. 6
Fig. 8
Fig. 7