PN 9000-280-VE, Rev B
Installing the Exhaust Tube (Optional) ....................................................................................2-6
Installing the Analyzer ..................................................................................................................2-7
Calibration/Aspirator Air ..............................................................................................................2-9
Connections ..........................................................................................................................2-10
Purging Operation – “Safe” Pressure ...............................................................................2-10
Purging Instructions ............................................................................................................2-12
Installing the AMEVision Display User Interface ....................................................................... 2-16
AC Power and Signal Connections ................................................................................................ 2-17
General Wiring and Conduit Requirements ....................................................................... 2-17
WDG-V UOP AC Mains Supply Connections ...................................................................... 2-20
EMC Grounding, Shielding and Noise Protection .........................................................2-21
EMC Grounding Method ....................................................................................................2-21
Transient and RFI Interference ..........................................................................................2-22
Installing the PC Configurator Software (Typical Communication Option) ........... 2-27
Setting the Analyzer Address Using the Dip Switch (to Enable
Communications Between the Analyzer and the PC Configurator Software) ......2-27
Connecting the PC to the Analyzer ..................................................................................2-28
Connecting a Single Analyzer ...........................................................................................2-31
Connecting Multiple Analyzers .........................................................................................2-31
Final Daisy Chain Connection Configuration Setting .................................................2-32
Replacing a WDG-IV UOP Analyzer With a WDG-V UOP Analyzer...........................2-34
AMEVision Communication Troubleshooting Checks ................................................2-36
iv | WDG-V UOP ATEX-IECEx Combustion Analyzer