PN 9000-280-VE, Rev B
Pre-Installation Requirements
Personnel Technical Level Required for Installation
The operations in this section should be performed only by qualified
service personnel experienced in electrical safety techniques. Never
service the analyzer unless power has been removed from the analyz-
er, and the analyzer has been allowed to cool for at least 90 minutes.
Also, always use gloves when working on the analyzer.
Storage Prior to Installation
If the analyzer is stored for any period of time prior to installation, store the
equipment in an environment where it is not subject to dripping or splashing
liquids, corrosive gases, high humidity, or excessive heat or cold. Recommend-
ed storage conditions include:
Temperature:
0 °C to 50 °C (32 °F to 122 °F)
Relative Humidity:
<70 %
Failure to comply with these storage conditions will void your warranty.
Analyzer Site Preparation
Observe the following guidelines when selecting an analyzer installation
location:
• Select a readily accessible position for the analyzer to allow for routine
maintenance. Comfort levels for maintenance personnel should be consid-
ered in placement of the analyzer and AMEVision Display User Interface.
• The installation location should be free from excessive vibration and
the ambient temperature is required to be within the limits listed in the
specifications. If the ambient temperature is outside the specified limits
or the vibration is excessive, contact your AMETEK representative to dis-
cuss solutions and special options to address ambient temperatures.
2-2 | Thermox
®
WDG-V UOP ATEX-IECEx Analyzer