5-12 | Thermox WDG-1200/1210 Insitu Probes
maintenance
routine maintenance schedule
Ensure the following routine maintenance schedule is followed. Failure to do so
may invalidate the terms of warranty.
Every Month
Perform a complete calibration (unless automatic calibration is enabled).
Every 6 months
comPonent
Procedure
action
Ceramic Filter
Visual inspection.
Remove and clean.
Change if damaged or contami-
nated.
Zirconia Cell
Check Cell resistance.
if resistance exceeds 1200 Ohms
the cell needs to be replaced.
Calibration Gas
Check supply pressure.
Replace cylinder if the pressure
falls below specified pressure.
Calibration Gas Pipes
Check integrity of pipes.
Replace if damaged.
Summary of Contents for Thermox WDG-1200 Insitu
Page 9: ...ix...
Page 15: ...1 6 Thermox WDG 1200 1210 Insitu Probes This page intentionally left blank...
Page 19: ...2 4 Thermox WDG 1200 1210 Insitu Probes This page intentionally left blank...
Page 86: ...Maintenance and Troubleshooting 5 13 This page intentionally left blank...
Page 98: ...6 12 Thermox WDG 1200 1210 Insitu Probes This page intentionally left blank...