4.1 First Startup
When first power on, if it shows the power-on password page, as shown in Figure4-1, please
contact the agent to obtain the startup password. The corresponding button function is as
shown in Table4-1.
After entering the right password, it will show the main page.
Figure4-1 Power-on password page
Table4-1 Button function on power-on password page
4.2 Main Page
Main page can show date & time, inverter status, as shown in Figure4-2. When the inverter is
grid-connected, the main page will show the daily power, gross power and output power
circularly, as shown in Figure4-3 to Figure4-5. The corresponding button function is as shown
in Table4-2.
Figure4-2 Main page
Figure4-3 Grid-connected main page (1)
Figure4-4 Grid-connected main page (2)
Power-on Psw:
0
0 0 0 0 0
17/01/01 12:00
E_total 000.0kWh
17/01/01 12:00
Status: STANDBY
17/01/01 12:00
E_daily 000.0kWh
17/01/01 12:00
P_out 0.00kW