
Worldwide Energy and Manufacturing USA Co., Limited
11
CAUTION:When installation, please keep the installation holder horizontal.
Figure3-8 Mark the drilling position
NOTE:The depth of drilled holes should be within 45~55mm. Clear the dust and measure the
net depth. Ensure that the depth of four holes is the same.
Step 3 Install the equipped 4 expansion plugs into the holes, as shown in Figure3-9.
Figure3-9 Install expansion plugs
Step 4 Align the holes of installation holder with the expansion plugs and install the
self-tapping screws and flat gasket into the expansion plugs (as shown in Figure3-10) and
fasten them by screwdriver.
Figure3-10 Fasten the installation holder
Step 5 Uplift the inverter and hang the inverter to the installation holder, as shown in