20
GROUNDING
This test will prove that over current protection devices are working fine and
will protect the electrical equipment in case of short circuit. Connect the
negative terminal from an ohmmeter to the negative terminal of the battery
bank. Measure electrical resistivity between battery negative terminal and:
Electrical enclosure mounting plate
Ternimanl 61 into each contrôller
Metallic points around each switch
Metallic points around call station
Ruide Rails
Platform frame
Underpan
Flap
Column
Each meausre must be under 0.3
Ω
Summary of Contents for Titan Incline Lift
Page 1: ...INSTALLATION Titan Incline Lift ...
Page 8: ...9 UPPER MECHANICAL STOP ...
Page 11: ...12 INSPECTION Titan ...
Page 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Page 20: ...21 MAINTENANCE Titan Incline ...
Page 23: ...24 USER MANUAL Titan Incline Lift ...
Page 25: ...26 RATING PLATE ...