11
FLOOR
a) Install the (gas spring or linear actuator)** on the floor rocker
b) Adjust the floor level with ½ nominal weight (250 LBS)
c) Adjust all floor level switches so that a 15˚ will open the circuit
**NOTE:
MANUAL ACTION VEHICULE REQUIRE GAS SPRING
AUTOMATIC ACTION REQUIRE LINEAR ACTUATOR
FINALIZING
a) Install the lower call station
b) Rout the electrical power to the cut off
c) Install screw covers on rails
d) Install front platform cover
Summary of Contents for Titan Incline Lift
Page 1: ...INSTALLATION Titan Incline Lift ...
Page 8: ...9 UPPER MECHANICAL STOP ...
Page 11: ...12 INSPECTION Titan ...
Page 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Page 20: ...21 MAINTENANCE Titan Incline ...
Page 23: ...24 USER MANUAL Titan Incline Lift ...
Page 25: ...26 RATING PLATE ...