17
MAIN CONTACTOR C1
a) Install a min 18AWG jumper between terminal 60 and 68. This will
apply 24Vdc directly on the C1 coil
b) After 1.5 sec, the controller will code a fault. The indicator for output A
will become negative image.
c) Remove the jumper between terminal 60 and 68
d) Reset the controller by pressing the Z4 button
e) Connect one end of a jumper to the terminal 60
f) Call for an upper landing, connect the other end of the jumper to the
terminal 68 and press the E-Stop.
g) Lift should stall immediately
h) Remove jumper between terminal 60 and 68
i) Reset the controller by pressing the Z4 button
j) Disconnect the wire from terminal 65
k) Call for an upper, or lower landing
l) Lift should stall about ½ second after the beginning of the movement
m)
Reconnect wire to terminal 65
n) Reset the controller by pressing the Z4 button
Summary of Contents for Titan Incline Lift
Page 1: ...INSTALLATION Titan Incline Lift ...
Page 8: ...9 UPPER MECHANICAL STOP ...
Page 11: ...12 INSPECTION Titan ...
Page 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Page 20: ...21 MAINTENANCE Titan Incline ...
Page 23: ...24 USER MANUAL Titan Incline Lift ...
Page 25: ...26 RATING PLATE ...