21
Installation (Vent-Air Intake System Installation) continued-
9. From outside the building, slide the five (5) inch
(12.7 cm)
diameter
telescopic tube through the opening in the wall until the outer wall mount
plate is flush with the wall (See Figure 12).
Figure 12
10. Using the supplied special RTV silicone sealant, apply a bead one (1)
inch
(2.5 cm)
from the end of the three (3) inch
(7.6 cm)
diameter tube
that is part of the vent-air intake terminal. Slide the direct vent-air
intake terminal into the three (3) inch
(7.6 cm)
diameter telescopic tube
that extends through the wall and position it so it is flush with the outer
wall mount plate. Make sure that the rain guard and the word “HOT” on
the end of the direct vent-air intake terminal are oriented properly.
Secure the direct vent-air intake terminal to the outer wall mount plate
and wall with four (4) #10 x 1 inch screws (supplied) (See Figure 13).
Note: Certain construction of walls may require the use of different type
of anchoring means than supplied.
DO NOT
modify the direct vent-air
intake terminal or outer wall mount plate.
Summary of Contents for DIRECT VENT GAS WATER HEATER
Page 10: ...10 Installation continued Figure 2 Figure 3 ...
Page 15: ...15 Installation Horizontal and Vertical Vent Air Intake Lengths continued Figure 6 ...
Page 27: ...27 Water Connections continued ...
Page 37: ...37 DIRECT VENT WATER HEATER ...
Page 38: ...38 VENT AIR INTAKE KITS ...
Page 40: ...40 NOTES ...