
113289 - 6
www.adclaundry.com
47
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, setscrews, grounding connections, and nonpermanent gas connections (i.e., unions,
shutoff valves, and orifices). Fan (impellor) V-belts, along with the motor and drive belts
should be
examined
and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of controls and
valves. Complete operational check of
ALL
safety devices (i.e., door switches, lint drawer switch, sail switch,
burner, and hi-limit thermostats).
Squirrel cage type fan (impellor) on the blower motor
must be
inspected and cleaned every 6 months.
C. LUBRICATION
The fan shaft bearing, and
ALL
the tumbler drive shaft and idler shaft bearings
must be
lubricated every 3
months. Use a #2 Alvania grease or its equivalent. Lubrication is necessary or premature bearing failure will be
the result.
The motor bearings are permanently lubricated and
DO NOT
require to be serviced.
Summary of Contents for AD-202
Page 10: ...6 American Dryer Corp 113289 6 202 SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 11: ...113289 6 www adclaundry com 7 202 SPECIFICATIONS STEAM WITH OPTIONAL STEEL STEAM COIL ...
Page 13: ...113289 6 www adclaundry com 9 202DR SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 15: ...113289 6 www adclaundry com 11 202 AGA SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 35: ...113289 6 www adclaundry com 31 ...
Page 62: ...ADC Part No 113289 6 02 07 15 ...