C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions
should be
made of noncombustible material.
NOTE:
Allowances
must be
made for opening the control door.
A 38-inches (96.52 cm) recommended minimum clearance for loading the dryer.
B The maximum thickness of the bulkhead for gas dryers is 4-inches (10.16 cm). For electric and steam
dryers the maximum thickness of the bulkhead is 1-inch (2.54 cm) within 3-inches (7.62 cm) from the top of
the control door.
C For gas and electric dryers a minimum overhead clearance of 12-inches (30.48 cm) is required, providing no
sprinkler is located above the dryer. For steam dryers or if a sprinkler is located above the dryer, 18-inches
(45.72 cm) is required.
D Dryer should be positioned 12-inches (30.48 cm) away from the nearest obstruction and 24-inches (60.96
cm) is recommended for ease of installation, maintenance, and service.
E 2-inch (5.08 cm) minimum is required for opening the control door.
F Flooring should be level or below dryer cabinet for ease of removing panels during maintenance.
G Dryers may be positioned sidewall to sidewall, however a 1/16” (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door, along with the removal of panels during maintenance.
Summary of Contents for AD-202
Page 10: ...6 American Dryer Corp 113289 6 202 SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 11: ...113289 6 www adclaundry com 7 202 SPECIFICATIONS STEAM WITH OPTIONAL STEEL STEAM COIL ...
Page 13: ...113289 6 www adclaundry com 9 202DR SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 15: ...113289 6 www adclaundry com 11 202 AGA SPECIFICATIONS WITH MANUAL VERTICAL DOOR ...
Page 35: ...113289 6 www adclaundry com 31 ...
Page 62: ...ADC Part No 113289 6 02 07 15 ...