User’s guide
2-2
2.3 Arrival at the harbour
If the boat will be uninhabited for a few weeks, do the following instructions :
-
furl the sails,
-
ease off the halyards for the jib, mainsail and mizzen,
-
release the leach lines for the jib, mainsail and mizzen,
-
put the jib in his sailbag,
-
set the pin of the mizzen,
-
put the plastic protections on the wheel house’s equipment,
-
check the boat is well berthed,
-
put out fenders,
-
rinse with fresh water all the parts of the masts and equipment close to the
bottom (furling systems, windlass, winches, …),
-
rinse the desalinator with fresh water,
-
set the bow thruster pin,
-
block up the deck hatches and the aft cabin hatch (setting the pin like on
the next pictures),
Picture 97 – Blocking up a deck hatch
Summary of Contents for FR-AML SM
Page 1: ...Super Maramu 2000 User s Guide Le respect de la mer...
Page 2: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 18: ...User s guide 1 6 Pict 2 Damaged mass research switch...
Page 35: ...User s guide 1 23 Picture 17 Clutch pin c c c c d d d d...
Page 57: ...User s guide 1 45 Picture 45 Storage of the aft wood bar...
Page 72: ...User s guide 1 60 Picture 65 Fresh water pump Fresh water pump Air conditioning pump Sensor...
Page 93: ...User s guide 1 81 Picture 92 Lifting the chart table Hook Way kept for the SSB wires...
Page 102: ......
Page 122: ......
Page 126: ...User s guide 5 2...