background image

Orientation Aid for the Start of the Season

 - ZA-TS

Version 08/2018 

Page 8

III

I

IV

II

2

1

7.  Use of the mobile test rig / EasyCheck

The mobile test rig or EasyCheck allow 

testing

 of the 

lateral distribution

 directly on 

the field. You can find more information in the operating manual. With 

ArgusTwin

use of the mobile test rig or EasyCheck is 

 mandatory

!

Assembly:

   The test rig contains 16 collection trays incl. a grid or mats 

and 2 measuring cups.

  Set up 4 collection trays/mats in a row.

  With the 4 rows 

(I … IV)

, half of the working width is covered.

   Distribute the other rows evenly. The terminal also provides the spacing of the 

rows as an aid.

Drive over the test rig as follows:

a)  Drive on tramline 

(1)

.

b)  Check whether fertiliser has been collected in the row with the trays 

(I)

 

  If not, only drive on tramline 

(2)

 

  If yes, drive on tramlines 

(2)

 

and

 

(3)

.

 

Mobile test rig:

 →

   Fill the content of the row of trays into the measuring cup and read the 

value.

 →

   Entry of the data on the terminal. If you press on "Save", the corrections 

will then be automatically adopted and saved in the fertiliser database.

 EasyCheck:

 →

   All other steps are performed using the "EasyCheck" smartphone app.

c)  Be sure to perform another test run after each correction.

1

2

3

III

I

IV

II

Summary of Contents for ZA-TS Super

Page 1: ...Orientation Aid for the Start of the Season ZA TS Version 08 2018...

Page 2: ...been read and understood The corresponding documents are shown on the left side For this reason it is necessary to take additional information from the operating manual The operating manual must alwa...

Page 3: ...and proper fastening Check the warning signs warning symbols and lighting Contact the responsible workshop if there is any damage or unclear circumstances Coupling the implement If the tractor is bein...

Page 4: ...troller is configured You can find more details on this in the operating manual for the implement software under section 8 3 2 Spread rate This value can also be automatically changed by the Task Cont...

Page 5: ...tch Black is OPEN white is CLOSED 9 Section status Green is open white is closed 10 Status of Section Control 11 Refill fertiliser 12 Both shutters open closed 13 Left right shutter open closed 14 Red...

Page 6: ...or if necessary check these settings on the implement To go to the Setting menu please proceed as follows Press on the User menu button on the Start screen 1 Scroll to the second screen 2 and select...

Page 7: ...cope setting for boundary spreading 10 Rate reduction for boundary spreading 11 Spreading disc speed for boundary spreading 12 Telescope setting for ditch spreading 13 Rate reduction for ditch spreadi...

Page 8: ...he working width is covered Distribute the other rows evenly The terminal also provides the spacing of the rows as an aid Drive over the test rig as follows a Drive on tramline 1 b Check whether ferti...

Page 9: ...ertiliser spreader from our database at any time free of charge To do so simply select your implement type and the spreading material Also available as an app for iPhone and other smartphones EasyChec...

Reviews: