background image

Orientation Aid for the Start of the Season

 - ZA-TS

Version 08/2018 

Page 6

5.  Preparations on the implement - Section Control

 

Commissioning of the ZA-TS can only begin when the terminal is fully  
configured.

  The Task Controller or activated documentation from the internal job  

management are managed through the terminal. You can find more  
information in the operating manual for the respective terminal.

  After you have configured the Task Controller in the setup of the terminal,  

you also have to enter or, if necessary, check these settings on the implement.

  To go to the Setting menu, please proceed as follows: 

Press on the "User menu" button on the Start screen 

(1)

. Scroll to the second* 

screen 

(2)

 and select the "ISOBUS configuration" button 

(3)

.

  Under the Documentation point, there is the choice between  "Implement 

internal" and "Task Controller" 

(4)

:

 If 

implement-internal documentation 

is desired, select 

"Implement-internal"

  If work is to be performed with 

job management in ISO-XML format

, select 

"Task Controller"

. You can find more information in the operating manual for 

the terminal.

It is possible that there is also a third screen, this depends on the  configuration 
(number of implement equipment options).

1

2

3

4

Summary of Contents for ZA-TS Super

Page 1: ...Orientation Aid for the Start of the Season ZA TS Version 08 2018...

Page 2: ...been read and understood The corresponding documents are shown on the left side For this reason it is necessary to take additional information from the operating manual The operating manual must alwa...

Page 3: ...and proper fastening Check the warning signs warning symbols and lighting Contact the responsible workshop if there is any damage or unclear circumstances Coupling the implement If the tractor is bein...

Page 4: ...troller is configured You can find more details on this in the operating manual for the implement software under section 8 3 2 Spread rate This value can also be automatically changed by the Task Cont...

Page 5: ...tch Black is OPEN white is CLOSED 9 Section status Green is open white is closed 10 Status of Section Control 11 Refill fertiliser 12 Both shutters open closed 13 Left right shutter open closed 14 Red...

Page 6: ...or if necessary check these settings on the implement To go to the Setting menu please proceed as follows Press on the User menu button on the Start screen 1 Scroll to the second screen 2 and select...

Page 7: ...cope setting for boundary spreading 10 Rate reduction for boundary spreading 11 Spreading disc speed for boundary spreading 12 Telescope setting for ditch spreading 13 Rate reduction for ditch spreadi...

Page 8: ...he working width is covered Distribute the other rows evenly The terminal also provides the spacing of the rows as an aid Drive over the test rig as follows a Drive on tramline 1 b Check whether ferti...

Page 9: ...ertiliser spreader from our database at any time free of charge To do so simply select your implement type and the spreading material Also available as an app for iPhone and other smartphones EasyChec...

Reviews: