Use of the implement
88
XTender BAG0158.2 03.18
10.4
Work commencemen
1. Move the implement to the working position at the start of the
field.
1.1 Instruct any people in the area to stand at a minimum
distance of 20 m from the implement.
1.2 Move the Xtender into working position and ensure ground
clearance of 20-30 cm, see figure.
1.3 Unfold the implement sections of the trailed soil tillage
implement and move into working position (see operating
manual for the respective implement).
1.4 Teach in the limit values for the working position sensor
(when changing the working depth on the soil tillage
implement).
2. Check all implement settings.
3. Run the blower fan up to nominal speed.
4. Start driving and put the soil tillage implement into operation.
5. Check after approx. 100 m completed at working speed.