Use of the implement
90
XTender BAG0158.2 03.18
10.5.1
Hopper residual emptying
Residual emptying is then accomplished by
turning the metering roller in the metering unit.
Like with the calibration test, the metered
material is collected in a collection bag.
1. Push the collection bag (1) under the
metering unit and open the flap (2) (see
section 8.2,
page
77).
2. Empty the hopper by turning the metering
roller (see control terminal operating
manual, section "Residual emptying").
The metering roller motor is generally switched on and off on the
control terminal in the tractor cab.
As an option, the Twin-Terminal can be connected to the control
terminal in the tractor cab and be attached directly beside the
metering unit to make entries using the keyboard.
10.5.2
Emptying the metering unit
The metering unit can be emptied as described in section 10.3.1,
page
oben. It is recommended to
remove the metering roller before deep-cleaning the metering unit.
1. Empty the metering unit.
1.1 Remove the metering roller (1)
(see section 8.1,
page
75).
→
The contents of the metering unit drop into
the collection bag.
2. Reassemble in the reverse order (see
section 8.1,
page
75).