54
Rev. 2
SYSTEM OPERATION
SEQUENCE OF OPERATION
(GUIS & GCIS Two Stage Models with White-Rodgers
50A51-215 Integrated Ignition Control)
NORMAL SEQUENCE OF OPERATION
1. Thermostat calls for heat (high heat or low heat).
2. The induced draft blower is energized on high speed for
a 10 second prepurge.
3. The induced draft blower is energized on low speed.
4. The igniter is energized and is allowed to preheat for 17
seconds.
5. The gas valve is energized delivering gas to the burners
at the low stage heat flow rate.
6. The control checks for a signal from the flame sensor
within seven seconds after the gas valve is energized
(opens). Gas will only continue to flow if a signal is
present.
7. The control checks the thermostat to see whether the
call for heat is for low stage heat or high stage heat. If
the call is for high stage heat, the induced draft blower is
switched to high speed and the gas valve is energized
on high flow rate.
8. The control waits 30 seconds and turns on the air circu-
lating blower to the appropriate speed (high heat speed
for high heat or low heat speed for low heat). On some
Amana models, the high heat air circulator speed may
be the same as the low heat circulator speed. These
models are factory shipped to be within the rise range
on both stages with the same air circulator speed.
9. The furnace is now operating on the specified stage called
out by the two stage thermostat.
10. If the two stage thermostat changes the call from low
heat to high heat, the control will immediately switch the
vent blower motor, gas valve, and air circulating speed to
their high stage setting.
11. If the two stage thermostat changes the call from high
heat to low heat, the control will immediately switch the
induced draft blower motor to low speed and switch the
flow rate on the gas valve to low. The air circulator motor
will remain on high heating speed for thirty seconds be-
fore switching to the low heat circulating speed. The 30
second delay feature on the circulator speed eliminates
the possibility of tripping the high (primary) limit when
the high stage flue products are traveling through the
heat exchanger upon a call for low stage heat.
12. The two stage thermostat is satisfied and opens.
13. The control turns the gas valve off.
14. After a five second delay while flue products are purged
from the heat exchanger, the induced draft blower motor
is turned off (the induced draft blower is on low speed
during the first five seconds post purge.)
15. The air circulator blower has an adjustable delay-off tim-
ing of 60, 90, 120, or 180 seconds (starting from the
time the gas valve closes). The speed(s) run during this
period depend on the last heat call seen by the thermo-
stat.
If the last call for heat was a call for low heat, the air circula-
tor motor will run on the low heat speed for the duration of
the adjusted delay-off timing (60, 90, 120, or 180 seconds).
If the last call for heat was a call for high heat, the air circu-
lating motor run on the high heating speed for thirty seconds
and then switch to the low heating speed for the balance of
the adjusted delay-off timing (30, 60, 90, or 150 seconds).
Seconds 0 5 0 45
On
Off
On
Off
On
Off
Indoor Fan
Outdoor Fan
And
Compressor
Thermostat
COOLING TIMING CHART FOR WHITE-RODGERS 50A51-215 INTEGRATED IGNITION CONTROL OPERATION