Supervisor 2000 Installation Instructions
Page 30
For Assistance: [email protected] +1 (909) 591-8431 PUD1601R6-1
Finish the Installation
Complete the following steps below only if the primary power, crossover cable, and access control wiring is connected.
1. Reinstall the lids and secure with the lid mounting screws.
2. Reinstall the end panels and secure with the end panel mounting screws.
3. Reinstall the side panels.
Post-Installation Checklist
1. Power On
SU2000 boots up successfully.
2. Lane Functionality
User status displays are functioning properly.
Auditory alarms are playing back correctly.
3. Access Control Integration
Installed card readers are successfully reading credentials.
Valid credentials are activating the turnstile.
4. Attachment
Cabinet lids, end covers, and base covers are securely fastened to the turnstile.
5. Wipe Down Turnstile
Stainless Steel – Wipe down stainless steel with a damp cloth or use Alvarado's recommended
commercial products (see
SU2000 User Guide
).
Powder Coated - Wipe down power coated surfaces with a damp cloth.
6.
Manuals Handoff
Provide both these
SU2000 Installation Instructions
, and the
SU2000
User Guide
to the project or site manager.