There is a power button located at the base of the end cabinet 

on the secured side of all master and center cabinets  

[Figure 26].

1.  Using a slim object such as a pencil or pen, push 

the power button. 

2.  The power-up cycle takes less than one minute to 

complete. Two chimes sound during the power-up 

cycle to indicate status:

•  Ascending Chime: Operating system booted 

successfully.

•  Descending Chime: Turnstile application 

launched successfully, and the power-up cycle 

is complete.

Powering On

Power 

Button

Power Button

Figure 26

NOTE

After the boot-up cycle is complete, the SU500 enters 

into the operating modes last configured.

Summary of Contents for SU2000

Page 1: ...Company Inc 12660 Colony Street Chino CA 91710 Phone 1 909 591 8431 Fax 1 909 628 1403 support alvaradomfg com www alvaradomfg com PUD1601R6 1 Supervisor 2000 SU2000 Barrier Free Optical Turnstile Ins...

Page 2: ...11 Pre Installation Instructions 12 Side Panel Removal 12 Lid Removal 12 End Panel Removal 13 Turnstile Layout 14 Baseplate Assembly Optional 15 Installation Instructions 16 Anchoring the Turnstile 16...

Page 3: ...and operations information must be adhered to Note the following precautions For indoor use only Use only skilled individuals to install and service the turnstile DO NOT operate the turnstile if it h...

Page 4: ...act Alvarado Center Cabinets are used to create additional lanes for multi lane configurations Each additional lane includes the parts below Single Lane Parts List Center Cabinet Parts List Per Center...

Page 5: ...n the entry and exit directions SU2000 Cabinets The master cabinet contains the main turnstile controller I O control board power supply sensor receivers and a power button located at the base on the...

Page 6: ...ng Ethernet cabling to the SU2000 master and center cabinets provides a number of benefits 1 It allows implementation of Alvarado s TCP IP control and monitoring software 2 It allows easy implementati...

Page 7: ...8431 Page 7 All dimensions are approximate Space Requirements 28 Lane Plan View Elevation View Footprint Drawing 28 Single Lane Plan Elevation Footprint Drawing Figure 3 For ease of installation and s...

Page 8: ...PUD1601R6 1 All dimensions are approximate Space Requirements 36 Lane Elevation View Plan View Footprint Drawing 36 Single Lane Plan Elevation Footprint Drawing Figure 4 For ease of installation and s...

Page 9: ...8431 Page 9 inches mm All dimensions are approximate Space Requirements 28 36 Optional Baseplates 28 Baseplate Figure 5 36 Baseplate Figure 6 For ease of installation and servicing Alvarado recommends...

Page 10: ...n the high voltage power line to further protect electronics NOTE The conduit openings for each cabinet are 8 x 2 80 203mm x 71mm The three required conduits will fit in these areas Figure 7 Primary P...

Page 11: ...ginning the installation Card readers or other physical access devices may be installed to the end panels on the right hand sides of the lane or on adjacent pedestals Card readers physical access devi...

Page 12: ...the lid screws located on the cabinet end panels as shown in Figure 9 There is one lid screw per side 2 Using a 2 Phillips head screwdriver remove the two 2 lid screws 3 Gently lift the lid in an upw...

Page 13: ...8431 Page 13 End Panel Removal 1 Locate the eight 8 end panel screws located on the inside of the frame Figure 10 2 Using a 2 Phillips head screwdriver remove the eight 8 end panel screw 3 Gently rem...

Page 14: ...the master controller cabinet components are facing the slave cabinet components and the power button s are located on the secured side The Lane 1 master cabinet is always the right most cabinet in re...

Page 15: ...trols must be accessible and provided to the turnstile The side plate on the baseplate must be removed in order to provide external power data or the side plate may be drilled with appropriate holes a...

Page 16: ...th respect to the floor and other cabinets A Measure the distance from the inside wall of one cabinet to the inside wall of the other cabinet on both the entry and exit side of the lane for a consiste...

Page 17: ...ctly 5 Insert the anchors into each drilled hole Figure 17 The threaded end of the anchor must be inserted into the hole first Use a rubber mallet to tap the anchors into place if needed Ensure that t...

Page 18: ...Card readers may also be installed on an adjacent pedestal Contact Alvarado for information on obtaining pedestals Card readers require separate power input do not pull this power from the SU2000 pow...

Page 19: ...a licensed electrician perform this procedure in accordance with all applicable local codes The primary wiring lines for 110VAC and 220VAC consist of the following Terminal 110V 220V Ground Green Gre...

Page 20: ...ge free dry contacts with the exception of the fire alarm input which can be configured via jumper on the I O control board to accept either a normally open or normally closed N C sustained contact MD...

Page 21: ...t MDC An output occurs when an unauthorized exit passage is completed 9 EXTACC Good Card Exit MDC Opens the turnstile for one authorized passage until passage occurs or timeout 10 EXTALRX Unauthorized...

Page 22: ...Key Control If this option has been ordered for your turnstiles two 3 position key switches are installed on the turnstile Turning the key to one of the three positions allows each turnstile direction...

Page 23: ...the ENTPAS and GND terminals 2 Using a wire jumper connect the ENTPAS and GND terminals Figure 23 Exit Direction 1 Locate the EXTPAS and GND terminals 2 Use a wire jumper to connect the EXTPAS and GN...

Page 24: ...during the functions check refer to the Troubleshooting section on Page 31 Before beginning the Post Installation Functions Check please read the following brief descriptions of the three SU2000 passa...

Page 25: ...such as a pencil or pen push the power button 2 The power up cycle takes less than one minute to complete Two chimes sound during the power up cycle to indicate status Ascending Chime Operating syste...

Page 26: ...e turnstile is connected Valid access cards are on hand for activating the turnstile CONTROLLED PASSAGE MODE Unauthorized Entry Exit Authorized Entry Exit Unsecured Side Unauthorized Entry shown Autho...

Page 27: ...ow is flashing No alarm sounds as the user enters and exits the turnstile Enter the turnstile User status display red icon is illuminated Unauthorized Entry alarm sounds No Passage Entry Exit Unsecure...

Page 28: ...ning the key to one of three positions overrides all existing settings placing the turnstile in Controlled Passage mode Free Passage mode or No Passage mode depending on the orientation of the key Ref...

Page 29: ...h programs and files field 5 Enter the following command ping XXX XXX X XXX where XXX XXX X XXX is the IP address of the turnstile Figure 30 6 A successful ping will result in the message shown in Fig...

Page 30: ...y 2 Lane Functionality User status displays are functioning properly Auditory alarms are playing back correctly 3 Access Control Integration Installed card readers are successfully reading credentials...

Page 31: ...ntact cleaner lubricant to connector pins and reseat Retry operation If condition persists perform the same process on the 16 pin connectors going into and out of the light boards and sensor boards Re...

Page 32: ...Multi Lane Conduit Requirements Two Lane Configuration Three Lane Configuration LANE 2 LANE 3 LANE 1 Master Cabinet Center Cabinet Center Cabinet Slave Cabinet Slave Cabinet Center Cabinet Master Cabi...

Page 33: ...09 591 8431 Page 33 Revision History Revision Date Author Description 6 0 02 12 15 A Flores Updated to new optical electronics configuration 6 1 07 17 15 A Flores Updated crossover cable length to 11...

Page 34: ...2014 Alvarado Manufacturing Company Inc This work may not be reproduced published or redistributed in whole or in part without the express prior written permission of Alvarado...

Reviews: