Wiring:

Use 18 AWG or larger for all low voltage power connections.

Note:

 Take care to keep power-limited circuits separate from non power-limited wiring (115VAC, Battery).

Maintenance:

Unit should be tested at least once a year for the proper operation as follows:

Output Voltage Test:

 Under normal load conditions, the DC output voltage should be checked for proper 

voltage level AL1024ULXB2: 24VDC nominal rated @ 10A max.

Battery Test:

 Under normal load conditions check that the battery is fully charged, check specified voltage

(24VDC @ 26.4) both at battery terminal and at the board terminals marked [– BAT +] to ensure that there is no 

break in the battery connection wires.

Note:

 Maximum charging current under discharges is 3.6A.

Note:

 Expected battery life is 5 years, however it is recommended changing batteries in 4 years or less if needed.

Fig. 2 - 

AL1024ULXB2 Board Configuration

2a

2b

2d

2c

2e

2f

L

G

N

BAT FAIL

AC FAIL

NC

C

NO

NC

C

NO

AC

DC

-   BAT   

+

+   DC   - 

AC DELAY

Summary of Contents for AL1024NK8QP Series

Page 1: ...Eight 8 programmable Class 2 power limited PTC protected outputs Two 2 network controlled Form C relays Built in Charger for sealed lead acid or gel type batteries AL1024NK8QP Series Networkable Dual...

Page 2: ...reatly reducing system downtime and elimi nating unnecessary service calls Stand by Specifications total current shown Output 15 min of Stand by and 5 min of Alarm 4 hr of Stand by and 5 min of Alarm...

Page 3: ...y when AC fails Maximum charge current 3 6A Zero voltage drop when switched over to battery backup Fire Alarm Disconnect LINQ8PD CB Supervised FACP disconnect Latching or Non Latching FACP reset N C o...

Page 4: ...are not used a loss of AC will result in the loss of output voltage When the use of stand by batteries is desired they must be lead acid or gel type Power supply s battery charging circuit is factory...

Page 5: ...proper voltage level AL1024ULXB2 24VDC nominal rated 10A max Battery Test Under normal load conditions check that the battery is fully charged check specified voltage 24VDC 26 4 both at battery termin...

Page 6: ...its Terminal Identification AL1024ULXB2 Power Supply Board Terminal Legend Function Description L N Connect 115VAC to these terminals L to hot N to neutral Fig 2a pg 5 DC Factory connected to LINQ8PD...

Page 7: ...g or Tamper Contact rating 1A 30VDC L AC Fail NC C Relay3 Programmable for AC Fail or AC Fail Battery Fail reporting Contact rating 1A 30VDC power limited M OUT1 to OUT8 24VAC 28VAC or 12VDC 24VDC con...

Page 8: ...24ULXB2 12VDC from VR6 mounted under LINQ8PD CB Battery input factory wired Connect batteries Factory wired supervisory connections power limited Factory wired supervisory connections power limited FA...

Page 9: ...Click the button labeled Submit Network Settings A dialog box will display New network settings will take effect after the server is rebooted Click OK DHCP A After selecting DHCP in the IP Address Me...

Page 10: ...connected to any DC power supply ies or AL1024ULXB2 power supply ies being monitored prior to programing Factory Default settings IP Address 192 168 168 168 User Name admin Password admin 1 Set the st...

Page 11: ...n Alarm ________________ A G Alarm duration Hours 15 Min 0 25 Hour Alarm ________________ H H Battery capacity required for Alarm E F G ________________ AH I Total calculated battery capacity D H ____...

Page 12: ...1 8mm 1 25 31 8mm 0 79 20 1mm 0 91 23 1mm 0 91 23 1mm 15 5 393 7mm 1 1 27 9mm 1 1 27 9mm 1 1 27 9mm 12 23 310 6mm 2 0 50 8mm 2 0 50 8mm 1 25 31 8mm 1 25 31 8mm Enclosure Dimensions BC400 15 5 x 12 x 4...

Reviews: