44
Louvre Glazing
10
Gutter and Downpipe Installation
11
If you haven’t already done so you could now
install the louvre glass (diagram 66).
Make sure the tabs on the glass retainers are
pinched slightly so they hold the glass tight.
Standing on the inside of the building slot the
first louvre slat in until it hits the bottom tab of
the retainer. Repeat this until all are installed.
With help position your gutter on the rear side face of the
eaves bar, this should be the same length as the eaves bar
and fit between the ends of the roof corner bars. Fix it in
place with 25mm Pan Head screws, diagram 67. The top
edge of the gutter parts should not come above the
angled part of the eaves bars else glass interference will
occur.
Fit the plastic pipe insert (D201) into the ends of the
gutter for your down pipe to run out of (diagram 68). Use
a small amount of silicone to seal this in place.
Dia. 66
Internal
Diagram 66
Gutter Parts
Part Name
Part
Number
9x8 9x12
Gutter 8’ long
EV0622M
1
-
Gutter 12’ long
EV0624M
-
1
Porch Gutter 1’ Long LH
EV1163M
2
1
Porch Gutter 1’ Long RH
EV1164M
2
1
Porch Gutter 3’ Long LH
EV1165M
-
1
Porch Gutter 3’ Long RH
EV1166M
-
1
Porch Gutter Insert
EV1168
Stop end RH
EV0535M
3
Stop end LH
EV0536M
3
Downpipe Bracket
EV0740M
8
Downpipe Outlet
D201
4
Downpipe Shoe
D207
12
Rubber Blank
D214
2
2
Downpipe
D211
4
Clear Silicone
02-1356
3
4