![Alton Victorian Elmhurst Porch DW 9x12 Instruction Manual Download Page 24](http://html1.mh-extra.com/html/alton/victorian-elmhurst-porch-dw-9x12/victorian-elmhurst-porch-dw-9x12_instruction-manual_2912750024.webp)
24
Frame Assembly
6
Before you position your sections onto the wall you should drill the pilot holes in the bottom of the
end gable side corner bars (EV0490 / EV0491) shown in diagram 31. The position of these holes
should be about 19mm from the rear face and 30mm measured from the bottom end of the bar.
You can now position the end gable section on the wall, you will need a helper to hold this in place
or simply strap it to a set of steps.
Now offer the rear / side assembly (or side 4’/8’ extension assembly if your model is longer than 12’,
see additional instruction manual) slotting the corner bar onto the end of the eaves bar, do not fix
this joint as it will be done at a later stage (diagram 32). Screw the bottom of the corner glazing bar
to the end of the cill (80mm screw) making sure the rebate for the glass lines up with the front face of
the side cill (diagram 31).
Dia. 32
Dia. 31