With all the felt in place you can lower the first slatted roof panel into place. Its best to start above
the door and work around the building from there. Ask a helper to hold the first roof panel while you
position the fascia board below. You will notice the holes are slightly off-set, these should be closest
to the bottom edge of the fascia in this installation.
You will need to trim the felt at the corners, trim the
bottom layer and overlap the top layer. Then push the
fascia up until it touches the underside of the bottom slat.
The treated softwood frame should then sit in behind it
(diagram 67). Fix the fascia in place with 40mm pan head
stainless steel screws, this will then support the roof
section while you fix the rest of the fascias.
AB0048
Make sure the felt is
folded down tight along
the bottom of the roof,
also line up the ends of
the fascia with the corner
of the soffits. The more
time you take over lining
these up will make a big
difference to the overall
finish.
Slatted Roof Installation (optional)
11
Summary of Contents for SUMMERHOUSE MICKLETON
Page 1: ...08 17...
Page 12: ...12 Side Assembly Fit the opposite panel as you did the last Diagram 14 AB A0 03 8F 4...
Page 25: ...25 Diagram 41 Roof Assembly 6 Make sure the ply roof sheet does NOT protrude past the soffits...
Page 48: ...48 Notes...
Page 49: ...49 Notes...
Page 50: ...50 Notes...