26
AlterG Installation Manual
105440 rev C
7.
Connect the inlet port of the
bag to the outlet of the blower.
Slide the bag all the way up
until it touches the white
elbow and then clamp it to the
blower outlet tube with a band
clamp and protective rubber
strip.
8.
Feed the power and treadmill
signal cables through the bag
port. Connect the treadmill
signal cable to the
corresponding cable coming
from the cable guide
9.
Each cable has a thin band of
heat shrink to mark the
location of clamping (see step
10).
10.
The pressure tube has an
elbow joint at the end, with a
steel tube protruding from the
joint. Insert the steel tube
through the bag port so that
the elbow is flush with the top
of the port. Place a rubber strip
around the port and clamp the
pressure tube and cables with
the specified clamp.
Heat Shrink
Heat Shrink
located here
Elbow pushed down to cuff