Transport, siting and installation
50
Transport, siting and installation
0000010038-003- GB
Assembly steps:
•
Carefully push the rip fence onto the round bar
•
Place the TPV onto the brackets on the table top and insert the fastening
screws of the support arms into the holes on the table top face end.
•
Loosely secure to the table top with two M10 nuts and U-shaped washers
•
Screw-fit the TPV to the aluminium brackets (6)
•
Tighten the M10 nuts.
•
If necessary, correct the alignment and flushness by readjusting the sup-
port screws (4).
Summary of Contents for F45 ProDrive
Page 8: ...Identification 8 Identification 0000010038 003 GB EC prototype testing certificate...
Page 9: ...Identification 9 0000010038 003 GB Identification...
Page 10: ...Identification 10 Identification 0000010038 003 GB GS test certificate...
Page 11: ...Identification 11 0000010038 003 GB Identification...
Page 12: ...Identification 12 Identification 0000010038 003 GB DGUV Test Certificate...
Page 13: ...Identification 13 0000010038 003 GB Identification...
Page 14: ...Identification 14 Identification 0000010038 003 GB C US Certificate...