RPV311
Chapter 2
– Safety Information
38
RPV311-TM-EN-6
4
INSTALLATION, COMMISSIONING AND SERVICING
4.1
LIFTING HAZARDS
Many injuries are caused by:
Lifting heavy objects
Lifting things incorrectly
Pushing or pulling heavy objects
Using the same muscles repetitively
Plan carefully, identify any possible hazards and determine how best to move the product. Look at other
ways of moving the load to avoid manual handling. Use the correct lifting techniques and Personal Protective
Equipment (PPE) to reduce the risk of injury.
4.2
ELECTRICAL HAZARDS
All personnel involved in installing, commissioning, or servicing this equipment must be
familiar with the correct working procedures.
Consult the equipment documentation before installing, commissioning, or servicing the
equipment.
Always use the equipment as specified. Failure to do so will jeopardise the protection
provided by the equipment.
Removal of equipment panels or covers may expose hazardous live parts.
Do not touch until the electrical power is removed. Take care when there is
unlocked access to the rear of the equipment.
Isolate the equipment before working on the terminal strips.
Use a suitable protective barrier for areas with restricted space, where there
is a risk of electric shock due to exposed terminals.
Disconnect power before disassembling. Disassembly of the equipment may expose sensitive
electronic circuitry. Take suitable precautions against electrostatic voltage discharge (ESD) to
avoid damage to the equipment.
NEVER look into optical fibres or optical output connections. Always use optical power meters
to determine operation or signal level.
Summary of Contents for Reason RPV311
Page 2: ......
Page 15: ...INTRODUCTION CHAPTER 1...
Page 34: ...SAFETY INFORMATION CHAPTER 2...
Page 45: ...HARDWARE DESIGN CHAPTER 3...
Page 56: ......
Page 57: ...CONFIGURATION CHAPTER 4...
Page 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Page 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Page 117: ...OPERATION CHAPTER 5...
Page 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Page 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Page 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Page 155: ...RECORDS CHAPTER 6...
Page 172: ......
Page 173: ...TW FAULT LOCATOR CHAPTER 7...
Page 183: ...PMU CHAPTER 8...
Page 189: ...MODBUS CHAPTER 9...
Page 193: ...DNP3 CHAPTER 10...
Page 196: ......
Page 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Page 200: ......
Page 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Page 228: ......
Page 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Page 249: ...COMMUNICATIONS CHAPTER 14...
Page 261: ...INSTALLATION CHAPTER 15...
Page 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Page 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Page 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Page 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Page 340: ...APPENDIX A...