RPV311
Chapter 15
– Installation
RPV311-TM-EN-6
278
3-element
(Phases
A,
C
and
neutral)
connection
: in this case, the fourth element is
derived of the values measured by the other
elements. The three elements are equivalent to
the values applied to the equipment.
3-element
(Phases
B,
C
and
neutral)
connection
: in this case, the fourth element is
derived of the values measured by the other
elements. The three elements are equivalent to
the values applied to the equipment.
2-element connection
: in this case, the neutral
voltage is zero, and the three phase-to-ground
voltage are computed based on the two line-to-
line voltages applied to the equipment.
In circuits of one element, the measurements can be in two different ways:
An isolated phase or neutral measurement: If the element is a phase, only the voltage related to this channel
is measured considering the off-set compensation. If the element is a neutral, the voltage related to this
channel is measured without the off-set compensation.
A 3-Phase synthesis: The magnitude for the 3-phases is considered with the same value as that of the
channel measured and balanced (i.e., angles with 120º between each other).
Summary of Contents for Reason RPV311
Page 2: ......
Page 15: ...INTRODUCTION CHAPTER 1...
Page 34: ...SAFETY INFORMATION CHAPTER 2...
Page 45: ...HARDWARE DESIGN CHAPTER 3...
Page 56: ......
Page 57: ...CONFIGURATION CHAPTER 4...
Page 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Page 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Page 117: ...OPERATION CHAPTER 5...
Page 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Page 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Page 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Page 155: ...RECORDS CHAPTER 6...
Page 172: ......
Page 173: ...TW FAULT LOCATOR CHAPTER 7...
Page 183: ...PMU CHAPTER 8...
Page 189: ...MODBUS CHAPTER 9...
Page 193: ...DNP3 CHAPTER 10...
Page 196: ......
Page 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Page 200: ......
Page 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Page 228: ......
Page 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Page 249: ...COMMUNICATIONS CHAPTER 14...
Page 261: ...INSTALLATION CHAPTER 15...
Page 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Page 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Page 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Page 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Page 340: ...APPENDIX A...