22
041-037-B000-001, Rev. A (06/2013)
2.17 Air Conditioning Operation
Bring the generator to a normal operating temperature before applying the air conditioning load. Always
allow a 2 minute wait period when manually cycling an air conditioner off and on. A longer wait period
may be required under unusually hot weather conditions. Additionally, all other loads should be turned
off until the air conditioner has started and is performing normally. It is also important to follow the air
conditioner manufacturer’s instructions for starting and restarting for proper operation. Some air conditioner
manufacturers offer a start capacitor as an extra cost option. The air conditioner can overload the generator
by pulling too high a starting current if there is not a start capacitor on the air conditioner. Contact your air
conditioner dealer if you consistently have problems starting your air conditioner with the generator. This
generator is not generally recommended for air conditioners exceeding 13,500 BTUs.
2.0 Operation
Summary of Contents for ACX3100i
Page 1: ...ACX3100i Generator Operation Manual Effective July 2013...
Page 41: ......