19
Instructions for the installer
3.6 FLUE EXHAUST
PIPE CONNECTION
Th
e
fl
ue exhaust pipe must comply with local and national regulations
If the boiler is replaced, ALWAYS replace th
e fl
ue pipe.
Th
e boiler is approved for the draining settings described below:
HEAD AVAILABLE AT THE BASE OF THE CHIMNEY
S (Exhaust)
A (Intake)
Dp = 100 Pa
Dp = 40 Pa
Th
e maximum permitted length of the pipes is determined by the
head (Dp) available at the base of the chimney
C63
ATTENTION
To co
nfigur
e the C63 you need to order the optional air
intake kit which includes instructions on application.
Separate ducts for combustion air intake and evacuation of combus-
tion products. (Commercial accessories)
B23P
ATTENTION
For this type of connection, the room follows the same
installation regulations for boilers with natural draught.
Connection to a combustion product evacuation pipe outside the
room, the combustion air is taken directly from the room where the
device is installed.
HEAD AVAILABLE AT THE BASE OF THE CHIMNEY
S (Exhaust) A (Intake)
A (Intake)
Dp = 100 Pa -
-
Th
e maximum permitted length of the pipes is determined by the
head (
∆
p) available at the base of the chimney.
ATTENTION:
for the type of B23P connection, the room follows the
same installation regulations for boilers with natural
draught.
ATTENTION:
The fl
ue must comply with the standards in force
Summary of Contents for ARES Pro 150
Page 2: ......