21
Mounting process:
A. Preparation of mounting holes in the wall
– recommended
height is about 160cm from ground. Dimension of holes
depends on number of modules and here we mention
dimensions for 1,2 and 3 modules (basic mounting
boxes). The bigger sets are completed from those boxes
by their combination (under or next each other).
Modules
1
2
3
Height mm
140
257
374
Width mm
125
125
125
Depth mm
56
56
56
B. Preparation of mounting box for cable and mutual
connection of mounting boxes
C. Mounting box fixing into hole in the wall
D. Inserting of each module into the fixing frame
E. Inserting of spring to bottom part of mounting box
F. Inserting of fixing frame into spring in mounting box
G. Installing of fixing frame to mounting box by 4 screws
(supplied)
H. Completing of design frame
– firstly screw up side rails
with bottom part
I. Into design frame insert front panels of each modules
J. Last module (module on top) is slide into design frame
K. At the end screw up top part of design frame into side
rails
L. This complete as set is on picture (H+I+J+K) for further
set into next mounting box
M. Last step is put covers on design frame
Summary of Contents for GSM-VarioBell
Page 1: ...G S M D O O R I N T E R C O M GSM VarioBell User manual V 1 2...
Page 11: ...10 Signalling LED Speaker loudness regulation microphone speaker BBUTTON ABUTTON...
Page 17: ...16...
Page 21: ...20 Installation...
Page 23: ...22...
Page 32: ...31...