2
Subject to change without notice | 83057800cUK – Translation into English of the original German operating manual | ait-deutschland GmbH
Contents
1 About this operating manual
................................3
1.1 Validity
..............................................................................3
1.2 Reference documents
.............................................3
1.3 Symbols and identification markings
.............3
1.4 Contact
.............................................................................4
2 Safety
..........................................................................................4
2.1 Intended use
.................................................................4
2.2 Personnel qualifications
.........................................4
2.3 Personal protective equipment
..........................4
2.4 Residual risks
...............................................................4
2.5 Disposal
...........................................................................5
2.6 Avoid damage to property
....................................5
3 Description
.............................................................................6
3.1 Layout
...............................................................................6
3.2 Accessories
...................................................................7
3.3 Function
...........................................................................7
4 Operation and care
........................................................8
4.1 Energy and environmentally aware
operation
.........................................................................8
4.2 Maintenance
.................................................................8
5 Delivery, storage, transport and
installation
...............................................................................8
5.1 Scope of supply
..........................................................8
5.2 Storage
.............................................................................8
5.3 Unpacking and transport
.......................................9
5.4 Installation
....................................................................10
6 Installation and connection
..................................10
6.1 Dismantle the module box
..................................10
6.2 Install the hydraulic connections
....................14
6.3 Connect the electrical cables
...........................14
6.4 Installing the control
...............................................15
7 Flushing, filling and venting
.................................17
7.1 Remove the front panel of the module box
17
7.2 Heating water quality
.............................................17
7.3 Fill, flush and vent heat source
........................17
7.4 Flush and fill the heating and domestic hot
water charging circuit
............................................18
8 Insulate hydraulic connections
.........................18
9 Commissioning
................................................................19
10 Maintenance
.......................................................................19
10.1 Basic principles
.........................................................19
10.2 Maintenance as required
.....................................19
10.3 Yearly maintenance
................................................19
10.4 Clean and flush the evaporator und
condenser
.....................................................................19
11 Faults
.........................................................................................20
12 Dismantling and Disposal
.....................................20
12.1 Dismantling
..................................................................20
12.2 Disposal and Recycling
........................................20
Technical data/Scope of supply ....................... 22
Performance curves ......................................... 24
Dimensioned drawings ..................................... 27
Installation plans .............................................. 29
Hydraulic integration, unit variant H (heating) .. 32
Terminal diagram .............................................. 35
Circuit diagram 1/3 ........................................... 36
EC Declaration of Conformity .......................... 39