beginning first on one side and moving upwards,
lock the
screen's snap-in lugs in place
in the slots
provided on the front of the facade…
next, on the opposite side, moving upwards.
lock the screen's snap-in lugs
in place
in the slots
provided on the front of the facade…
finally, press the screen's upper snap-in lugs into
the slots provided on the front of the facade.
removing the sCreen
In order to remove the screen, the snap-in lugs must
first be loosened by pressing one side
completely
toward the middle of the screen
. Thereafter,
remove the snap-in lugs from the opposite side.
Commissioning
Danger!
the unit may be commissioned only with
the air ducts and weather/rain grill or wire
mesh grill installed and with the covers
closed.
proceed as follows:
conduct a thorough installation inspection and go
through the items on the general checklist.
“General checklist”.
The installation inspection will prevent damage
to the heat pump system that could be caused by
incorrect installation work.
make sure of the following…
•
Clockwise rotary field
of the load power
supply (compressor).
•
Installation and assembly
of the heat pump
according to the information in this operating
manual.
•
All electric installation work must be properly
completed.
•
A
3-pole automatic circuit-breaker
must
be installed for the compressor. It must have a
contact gap of at least 3 mm.
•
The heating circuit must be rinsed, filled and
thoroughly bled.
•
All valves and shut-off devices of the heating
circuit must be open.
•
All pipe systems and components of the system
must be sealed.
carefully fill out and sign the completion report for
heat pump systems…
“completion report for heat pump systems”.
In Germany:
Send completion report for heat pump systems
and general checklist to the manufacturer’s factory
customer service department.