13
We reserve the right to modify technical specifications without prior notice.
83051400aUK
© Alpha-InnoTec GmbH
1 eyelet on air flow baffle
2 brass bushing on frame
•
bolt air flow baffles to the frame on the switch cab-
inet side (= operator side) and water connection
side…
Return top cover to frame...
Suspend upper facing panels in the top cover. bolt
to the frame at bottom...
The air flow baffles are now installed. you can now
carry out mounting and installation work on the
unit, and afterwards attach the lower facing panels.
(see “Electrical connection work”, “Heat pump
side connection of control and sensor wires”)
.
attentIon
during extended interruptions in work, close
the unit with the lower facing panels.
installation / ConneCtion to heating CirCuit
attentIon
connect the unit to the heating circuit accord-
ing to the hydraulic diagram for the respective
model.
“Hydraulic connection” instructions.
Summary of Contents for LW 140 A/RX
Page 48: ......