45
in dE: Alpha-InnoTec customer service department 01803 003550
(0,09 €/min. aus dt. festnetz, mobilfunkpreise können abweichen)
in AT: Alpha-InnoTec customer service department 0820 500644
(0,15 €/min. aus dem festnetz und mobilfunk)
in cH: Alpha-InnoTec customer service department 062 748 20 01
In all other countries:
to the manufacturer’s local partner: .......................................................................................................................................
Completion report and request For FaCtory Commissioning
during factory commissioning, the system will be inspected to ensure that it is functioning properly. This ensures that all
factory specifications have been checked and that the system can operate reliably over an extended period. The factory
commissioning involves costs and is mandatory for extension of the warranty services.
initial Commissioning
repeat Commissioning
Heat pump type / serial number
Regulator type
ContraCtor
end Customer / operator
electric
heating
other company
company
contact person
last name
first name
Street address
Street address
postcode
Head office
postcode city
phone
phone
preferred date:
*)
Alternate date:
*)
date Time
date Time
*) The contractor must submit the completion report
along with the completely reviewed general checklist 14 business
days
prior to the desired date of commission. If there is a conflict with the date, you will be contacted by phone.
I hereby confirm that all preliminary work required for commissioning has been carried out and completed.
The system is ready for operation.
requested commissioning
IbN
(Item-No. 160 001)
IbN p5+
(Item-No. 160 003)
IbN 5+ (Item-No. 160 002)
IbN vp5+ (Item-No. 160 004)
IbN Wp + lG (Item-No. 160 008)
IbN vp EW (Item-No. 160 005)
IbN l (Item-No. 160 050)
I, the undersigned, hereby request commissioning in return for a fee.
Invoice to
contractor
End customer
/
operator
location
date
Name (block letters)
Signature
company stamp
In the event that the system is not ready for operation and if installation work has to be performed on the system by
the commissioning technician during commissioning, this will involve charges (billed separately) to the contractor. If the
system is not ready for operation, the commissioning technician can request a repeat commissioning, which will involve
additional costs. The contractor or an authorized representative must be present during commissioning.
It is absolutely necessary that the operator is present for the one‑time, free instruction that occurs during
commissioning.
A report will be prepared during commissioning.
FA
Z W
P F
or
m
bl
at
t U
K
82
05
22
h
We reserve the right to modify technical specifications without prior notice.
83051400aUK
© Alpha-InnoTec GmbH
Completion report for heat pump systems
Summary of Contents for LW 140 A/RX
Page 48: ......