Set the overflow valve

 NOTE

 

The activities in this section are only 

necessary for the integration of storage 

tanks in series

 

Complete the work steps quickly, otherwise 

the maximum return temperature may be 

exceeded and the heat pump switches to 

high-pressure fault

 

● Turn  the  adjusting  knob  at  the  overflow 

valve to the right to increase the 

temperature  difference  (the  temperature 

drop), turn it to the left to reduce it

 

System is running in heating mode (ideally in cold 

condition).

1.  In case of low heating curve: Set the system to 

“Forced heating”.

 

Operating manual of the heating and heat pump 

controller.

2. 

Shut off valves to the heating circuit.

3. 

Ensure that the total flow is routed via the over

-

flow valve.

4. 

Read out the flow and return temperature at the 

heating and heat pump controller.

 

Operating manual of the heating and heat pump 

controller.

5.  Turn the adjusting knob 

(①)

 of the overflow valve 

(②)

 until the temperature drop between the flow 

and return temperature is set as follows:

Outdoor temperature

Recommended 

settings

-10 °C

4 K

0 °C

5 K

10 °C

8 K

20 °C

9 K

30 °C

10 K

6.  Open valves to heating circuit.
7. 

Turn off “Forced heating” in the heating and heat 

pump controller.

19  Commissioning

 CAUTION

The unit may only be started up if the air 

ducts, weather and/or rain louvres have 

been installed and the facing panels are 

closed.

 

Relevant planning & design data of the system is 

documented in full.

 

The relevant energy supply company has been 

notified of operation of the heat pump system.

 

The system is air-free.

 

Installation check using the general checklist has 

been completed successfully.

1. 

Ensure that the following points are fulfilled com

-

pletely:

 

● Right-hand (clockwise) rotating load supply field is 

available at the compressor

 

The system is installed and mounted according to 

this operating manual

 

The electrical installation has been carried out 

properly according to this operating manual and 

the local regulations

 

The power supply for the heat pump is equipped 

with an all-pole circuit-breaker with at least 3 mm 

contact spacing (IEC 60947-2)

 

The tripping current is complied with

 

● The heating circuit has been flushed and vented

 

● All shut-off devices of the heating circuit are open

 

The pipe systems and components of the system 

are tight

2. 

Carefully fill in and sign the notice of completion 

for the heat pump systems.

3.  In Germany: Send notice of completion for heat 

pump systems and general checklist to the man-

ufacturer’s factory customer service depart-

ment.   

In other countries: Send notice of completion for 

heat pump systems and general checklist to the 

manufacturer’s local partner.

4.  Arrange for the heat pump system to be com-

missioned by the manufacturer’s authorised after 

sales service for a fee.

Summary of Contents for 10078702

Page 1: ...UK 83031300dUK Air Water Heat Pumps Indoor installation Operating Manual LW 300 L...

Page 2: ...Domestic hot water preparation 12 12 Domestic hot water tank 12 13 Electrical installation 13 14 Installation of the control unit 14 15 Installation and removal of the screen 15 15 2 Removing the scre...

Page 3: ...ing manual of the heating and heat pump controller Brief description of the heat pump controller Operating manual of the Comfort board 2 0 accessories Log book 1 3 Symbols and markings Identification...

Page 4: ...must be instructed and if necessary supervised by persons experienced in handling the product and who are re sponsible for safety Children must not play with the product The product may only be opene...

Page 5: ...essed air if necessary Improper action Requirements for minimum scale and corrosion damage in hot water heating systems Proper planning design and commissioning Closed system with regard to corrosion...

Page 6: ...eat pump side 3 2 Layout Basic components NOTE This section essentially names the compo nents relevant for fulfilling the tasks described in this operating manual The following figure shows an LW 300...

Page 7: ...uid refrigerant at a high pressure and high tempera ture is depressurised expansion valve The pressure and temperature drop and the process begins again The heated heating water can be used for the do...

Page 8: ...purposes and extend it to its original posi tions following transport 1 Unpack the unit Unpacking page 11 5 Scope of supply storage transport and installation IMPORTANT Damage to the housing and the u...

Page 9: ...e facing panel upwards remove and set aside in a safe place 4 Then remove side facing panels from the unit too and store safely Example Removing the lower facade on the operating side Example Removing...

Page 10: ...tain climatic conditions an ice lay er can therefore form in the air outlet area Install the heat pump such that the air blow er does not discharge into footpath areas Installation room and space requ...

Page 11: ...ing 9 Connect the unit to the heating circuit according to the hydraulic diagram for the respective model 9 Cross sections and lengths of the pipes for the heating circuit are adequately dimensioned 9...

Page 12: ...energetic air water systems integrate the buffer tank in the heating water outflow forward flow before the overflow valve 10 Circulating pumps NOTE Do not use regulated circulating pumps Circulating p...

Page 13: ...s closed open the lower facing panel on the operating side 2 Open electrical switch box of unit 1 Electrical switch box 3 Lead power cable power cable for circulating pumps and cable for external temp...

Page 14: ...ontrol unit down until it locks into posi tion 3 Stick the heating and heat pump regulator s con trol cable into the right bushing on the bottom of the control unit NOTE A connection to a computer or...

Page 15: ...me of delivery 1 recess for control unit 2 logo 3 temporary cover 1 First insert the screen below in the provided slots on the facade 2 Beginning first on one side and moving upwards lock the screen s...

Page 16: ...ed con sult a company specialising in the treatment of heating water Keep a system log for hot water heating systems in which relevant planning data is entered VDI 2035 16 2 Flush fill and vent the he...

Page 17: ...up if the air ducts weather and or rain louvres have been installed and the facing panels are closed 9 Relevant planning design data of the system is documented in full 9 The relevant energy supply c...

Page 18: ...im mediately Check regularly to ensure that the condensate can drain out of the unit freely without obstruc tion To this end check the condensate pan in the unit and the evaporator regularly for dirt...

Page 19: ...ainst being switched back on again Collect all media safely Separate components by their materials 22 2 Disposal and recycling Dispose of environmentally hazardous media in accordance with local regul...

Page 20: ...pressure bar 3 Circulation pump control range min I max l h Hot gas use Flow rate pipe dimensioning l h Free pressing Pressure loss Flow rate bar bar l h General unit data Total weight kg 490 Weight o...

Page 21: ...30 35 Temp C Pe kW 0 000 0 025 0 050 0 075 0 100 0 125 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 m h p bar p 15 20 25 30 35 40 45 50 55 60 65 25 20 15 10 5 0 5 10 15 20 25 30 35 40 Temp C Temp C L...

Page 22: ...B Side view from left D Side view from right E Rear view LR Air direction Pos Pos Designation Designation Dim LW 300 Dim LW 300 1 Control unit 2 Hot water outlet flow R 6 4 3 Hot water inlet return R...

Page 23: ...Side view from left D Side view from right E Rear view LR Air direction Pos Pos Designation Designation Dim LW 300L Dim LW 300L 1 Control unit 2 Hot water outlet flow R 6 4 3 Hot water inlet return R...

Page 24: ...bau im Lichtschacht Kippmass der W rmepumpe 2050mm Bezeichnung B1 Bei Fertigwandst rke 240 bis 320 B2 Bei Fertigwandst rke 240 bis 320 Bei Fertigwandst rke 320 bis 400 Bezeichnung 5 6 7 9 Bei Fertigwa...

Page 25: ...au im Lichtschacht Kippmass der W rmepumpe 2050mm 9 B2 Bei Fertigwandst rke 240 bis 320 Bei Fertigwandst rke 320 bis 400 5 6 7 Bezeichnung Bezeichnung B1 Bei Fertigwandst rke 240 bis 320 Bei Fertigwan...

Page 26: ...man die Luftkan le eink rzen Dies hat eine erhebliche Erh hung des Schalldruckpegels zur Folge Kippmass der W rmepumpe 2050mm 8 7 6 5 Bezeichnung Bezeichnung B2 Bei Fertigwandst rke 240 bis 320 Bei Fe...

Page 27: ...he Erh hung des Schalldruckpegels zur Folge KA Kondensatablauf G Schnitt Einbau im Lichtschacht Kippmass der W rmepumpe 2050mm 6 7 9 Bezeichnung Bezeichnung B2 Bei Fertigwandst rke 240 bis 320 Bei Fer...

Page 28: ...28 Subject to change without notice 83031300dUK ait deutschland GmbH Separation buffer tank LW 300 L...

Page 29: ...mfort board Expansion board 29 Dirt trap 0 6 mm mesh 15 Mixer circuit three way mixer MK2 3 discharge r o t a l u g e r e c n e r e f f i d e r u t a r e p m e T 7 1 l a n o i t p o g n i l o o c r o...

Page 30: ...er storage tank Hot water or buffer storage tank 3 pol Cut out compressor Attention Right hand rot field is mandatory Cut out controller unit Cut out auxiliary heating 1 Cut out auxiliary heating 2 Co...

Page 31: ...er supply output compressor clockwise rotary field is absolutely necessary Sump heating for compressor 1 Sump heating for compressor 2 Nozzle heating fan Motor protection fan Fan fuse 6 3 A Fan Contac...

Page 32: ...compressor X10 L X10 X10 N X10 PE EVU A1 X10 2 X10 3 X10 X10 4 X10 Legend UK 817456 Controller board Attention I max 6 3A 230VAC Defrosting pressostat Energy supplier contact closed on release bridge...

Page 33: ...EFS KEINE BERSETZUNG A1 Equipement Function A1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 TWE TWA TRL TVL THG TA TBW RVF CW TB1 Sensor mixing circuit 1 TA TBW RFV TB1 TWE TWA TRL TVL THG CW Legend UK 817456 Con...

Page 34: ...34 Subject to change without notice 83031300dUK ait deutschland GmbH...

Page 35: ...35 Subject to change without notice 83031300dUK ait deutschland GmbH...

Page 36: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf E info alpha innotec de W www alpha innotec de alpha innotec an ait deutschland GmbH brand UK...

Reviews: