OWNER'S MANUAL OF SEEDING-DRILL AS1
Old Cod.Q00A00136
New Cod. MANT2010/00634 R.2
INSTALLATION
- 13
Copyright ©2009 della Alpego spa® - All rights are reserved. Reprinting or unauthorized use of this manual is strictly forbidden without written permission by Alpego spa
4.5.1. SHORTENING THE UNIVERSAL JOINT WITH A RILSAN COATING
The universal joint can only be shortened by an authorized workshop
•
Take the two halves apart and keep them side by side in their minimum length position between the distribution shaft
and the ground drive-wheel (Pict. H).
•
Mark the outside protection tube as shown in the drawing
•
Take off the protection sleeves and cut the part marked Pict. 1
•
Shorten the inner sleeve by the same length
•
Cut the inner and outer structural steel tubes at the same length as the protection sleeves, debur and clean Pict. L
•
Grease the inner profile
Pay the utmost attention when shortening the inner tube, since it is covered by a thin film of wear-resistant
material. It is advisable to make the cut slowly, so as to avoid overheating the inner tube, which would cause
the ungluing of the wear-resistant film
H
I
L
4) Check the sense of rotation of the wheel: the metering unit must be made to rotate only with the ground drive-
wheel activated in the forward direction. In the opposite direction the metering unit should never be set in
motion because of the action of the free wheel: if that happens, contact your local dealer or the Manufacturer
immediately
4.6.
ASSEMBLING THE RADAR
After the seeding bar has been mounted on the quick-hitch kit, the radar must be mounted:
In order to do this correctly, follow the instructions below
1) Mount the two side plates with holes A and B which you will find in the package without blocking them completely on
the right-side seeding bar: this position coincides roughly with the position of the metering unit of the seed-drill.