T4PGF1 INSTRUCTION MANUAL
Page
16
SHAW-ALMEX INDUSTRIES LIMITED
June 14 2017
11 Required Maintenance Schedule.
11.1 Daily Inspection Check Sheet
The below pre-use inspection check sheet provides an outline of all components used in the safe operation of Shaw Almex
GF vulcanizing equipment. Survey the Control panel to insure all components are functioning properly and are in good
working order. Before operating the vulcanizer verify that all systems is operating properly. During the pre-use inspection of
equipment, items below can be check marked upon completion. If any of the check boxes fail Lock-Out Tag-Out the control
box immediately until completely restored to original operational OEM specification.
Unqualified personnel must not
open or work on these units. Any unauthorized work or adjustments immediately VOIDS warranty.
DAILY INSPECTION CHECK SHEET
*
All information to be printed and completed in ink.
Company Performing Inspection:
Location of Inspection:
Initial boxes if the item passes. Lock-out Tag-out immediately if not!
EQUIPMENT/ASSEMBLY
Mon
Tues
Wed
Thur
Fri
Sat
Sun
Complete system functionality check, ( see Daily Prestart Inspections Sec
8)
Electrical cable and cords are in good working order and not damaged.
Receptacle and locking clamp condition inspection
Case condition, (no damage or loose screws).
All warning labels / serial label inspection for voltage, phase and Hz
information clear and readable.
All controls must be free of visual damage and leaks
Check Earth / Ground fault system with the test button and test cable. Look
for visual indication.
Confirm that all indication light functionality, as per section 8.1. Required
daily testing Before Use
Check platen after control box function is confirmed with the test plug.
Confirm Earth / Ground light is functioning as described in Sec 7, ( platen
out a yellow indication, platen in, if good, a green indication. Red should
have been confirmed with the test plug
Check E-Stop operation.
Power supply verified/correct to equipment design and description on the
serial label.
Name of person performing inspection:
Date of Inspection:
Time Inspection Completed:
Initialed by person performing inspection:
Serial number of equipment inspected:
If any component is found to be unserviceable, tag the component out of service and notify the Supervisor in charge immediately.
Summary of Contents for T4PGF1
Page 21: ...T4PGF1 INSTRUCTION MANUAL Page 21 SHAW ALMEX INDUSTRIES LIMITED June 14 2017 14 WARRANTY...
Page 26: ...T4PGF1 INSTRUCTION MANUAL Page 26 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...
Page 27: ...T4PGF1 INSTRUCTION MANUAL Page 27 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...
Page 28: ...T4PGF1 INSTRUCTION MANUAL Page 28 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...
Page 30: ...T4PGF1 INSTRUCTION MANUAL Page 30 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...