87
Symbol
Identification
Function
2
Button
Platform emergency button
3
Return lever
Basket
ascent/descent
4
Return lever
Start up/shut-down the electric or internal combustion engine
4.5
Machine shut-down
4.5.1
Normal shut-down
During normal platform use, releasing the TRANSLATION joysticks (
10
and
11
) stops the
movement. Each track has a braking system that prevents the machine from moving unless
hydraulic pressure is exercised to disengage it (see sect.
4.2.1-Drive and steering).
Releasing the ASCENT or DESCENT platform (
15
) lever, under normal working conditions,
stops the related movement.
Disabling and restoring the platform have to occur as follows:
1.
Shut-down the platform according to the indications provided
2.
Cover the remote push-button with its guard (see picture below)
3.
Leave the basket using the related ladder
4.
Position the 3-position switch provided on the ground controls in central position and the
remove the key
5.
Disconnect the battery from the power supply using the related control
Push-button covered with its guard
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...