28
2.5
Transport and loading
You are advised to check the dimensional limits established for means of transport if the machine must
be transported to its specific work site (see sect. 1.6-Performance).
The machine can be loaded onto the vehicle in two different ways:
1)
Using chutes and the platform driving controls
: after having fully LOWERED the platform, the
operator can handle the machine by following the instructions in SECT. 4.3-STARTING and drive
the machine straight onto the vehicle. In this case, make sure that the ramp gradient is within the
gradeability indicated in the PERFORMANCE data and that the bearing capacity of the chutes suits
the weight of the machine.
2)
Removing the push-button from the base and driving the platform to the ground:
with the
platform in transport position, the operator can handle the machine directly from the ground by
means of the remote push-button and by following the instructions in SECT. 4.3-GROUND
CONTROL USING THE REMOTE PUSH-BUTTON (see photo below).
3)
Lifting the platform
using a CE certified beam (not included) that should have a vertical distance
of 350 mm between the hook and chain and, using hooks and steel ropes hooked to the holes marked
with signs (see photo below). The ropes must have safety factor equal to 5.
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...